About Us
Wednesday, 29 October 2008
The establishment of the College
Was formed a preparatory committee of the College in November 1997
College was approved by the Council of the League of Aden in May 1998
The study began in college in October 1998
Report on the total lifting of the Rector is interested in it for the development of the College
=====================================
1. College is still working premises since 1998 handed over to the secondary in addition to the administration building residence used by local teachers (which already exists, the situation 20 years ago and was only restored amendments to the local administration building to serve as residence for teachers).
2. There (7) small rooms were supposed to be restored roofs used to repair library, but stopped and the situation continues to deteriorate because of the ceilings.
3. Electrical system can only work on (the incomplete), which hampered much of the total needed to power the morning.
4. The number of teachers who receive salaries (since July 2001 only) 13 teachers and there is a need for the College for a number closer to 40 teachers to achieve self-sufficiency for the next few years (the number of people currently in school diploma courses in ten people of different disciplines and the number will rise significantly in Baklarios).
5. The number of employees and workers who receive salaries in college (4) only, while there is a need for about 20 staff working for the stability of work (by teachers much of the required administrative and laboratory as well as teaching for the conduct of their work).
6. Not to open the course Baklarios + lack of nutrition for students are essential factors for the reluctance of many students to attend college.
Second: study (a project for developing and updating the Faculty of Education / young)
A total cost of the work of the offices of engineering designs integrated with the overall development of engineering drawings and schedules of quantities and cost estimates (the study worked in April 1999) The study contains the following:
1. Internal housing for students (the role and the role of an additional rate is high) estimate 36119043 YR.
2. Great Hall (additional) estimate 4180797 YR.
3. Biology laboratory (Kcefov additional study) estimate 5959449 YR.
4. 4 additional roles (16 semester) estimate 23885903 YR.
5. The administration building (additional) estimate 13491737 YR.
6. Library (additional) estimate 12247406 YR.
7. Hammamet (additional) estimate 892,940 Yemeni riyals.
8. Cafeteria (additional) estimate 4293983 YR.
9. Housing Complex ((currently an additional accommodation for students) estimate 45665342 YR.
10. Warehouse (additional) estimate 3151164 YR.
11. Housing female students (a new building full) estimate 45968461 YR.
12. Outside the building 1 (secondary to secondary) estimate 5486810 YR.
13. Outside the building 2 (secondary to an internal department) estimate 7236390 YR.
Note that every part of this study is an integrated itself with the graphic so that the taking of any part implemented without requiring the implementation of other parts, according to need and potential
(There are study baptism integrated with the college is located in 128 pages).
Third: quick rest revealed shortcomings (until February 2002)
1. Reading room for students
2. Television Hall of students
3. Students collective kitchen + dining room
4. In the College Chapel
Was formed a preparatory committee of the College in November 1997
College was approved by the Council of the League of Aden in May 1998
The study began in college in October 1998

Report on the total lifting of the Rector is interested in it for the development of the College
=====================================
First: the current situation (February 2002)
1. College is still working premises since 1998 handed over to the secondary in addition to the administration building residence used by local teachers (which already exists, the situation 20 years ago and was only restored amendments to the local administration building to serve as residence for teachers).
2. There (7) small rooms were supposed to be restored roofs used to repair library, but stopped and the situation continues to deteriorate because of the ceilings.
3. Electrical system can only work on (the incomplete), which hampered much of the total needed to power the morning.
4. The number of teachers who receive salaries (since July 2001 only) 13 teachers and there is a need for the College for a number closer to 40 teachers to achieve self-sufficiency for the next few years (the number of people currently in school diploma courses in ten people of different disciplines and the number will rise significantly in Baklarios).
5. The number of employees and workers who receive salaries in college (4) only, while there is a need for about 20 staff working for the stability of work (by teachers much of the required administrative and laboratory as well as teaching for the conduct of their work).
6. Not to open the course Baklarios + lack of nutrition for students are essential factors for the reluctance of many students to attend college.
Second: study (a project for developing and updating the Faculty of Education / young)
A total cost of the work of the offices of engineering designs integrated with the overall development of engineering drawings and schedules of quantities and cost estimates (the study worked in April 1999) The study contains the following:
1. Internal housing for students (the role and the role of an additional rate is high) estimate 36119043 YR.
2. Great Hall (additional) estimate 4180797 YR.
3. Biology laboratory (Kcefov additional study) estimate 5959449 YR.
4. 4 additional roles (16 semester) estimate 23885903 YR.
5. The administration building (additional) estimate 13491737 YR.
6. Library (additional) estimate 12247406 YR.
7. Hammamet (additional) estimate 892,940 Yemeni riyals.
8. Cafeteria (additional) estimate 4293983 YR.
9. Housing Complex ((currently an additional accommodation for students) estimate 45665342 YR.
10. Warehouse (additional) estimate 3151164 YR.
11. Housing female students (a new building full) estimate 45968461 YR.
12. Outside the building 1 (secondary to secondary) estimate 5486810 YR.
13. Outside the building 2 (secondary to an internal department) estimate 7236390 YR.
Note that every part of this study is an integrated itself with the graphic so that the taking of any part implemented without requiring the implementation of other parts, according to need and potential
(There are study baptism integrated with the college is located in 128 pages).
Third: quick rest revealed shortcomings (until February 2002)
1. Reading room for students
2. Television Hall of students
3. Students collective kitchen + dining room
4. In the College Chapel
5. Complete restoration of old buildings and amend and update its electricity grid
6. Complete college and high fence
7. At the main gate with the guard rooms
8. At the podium major in college
9. Settlement and the total afforestation area
10. Generator (capacity of about 250 kilowatt)
11. Hi Jorgen car Qmartin
12. To another (for example, Diena)
6. Complete college and high fence
7. At the main gate with the guard rooms
8. At the podium major in college
9. Settlement and the total afforestation area
10. Generator (capacity of about 250 kilowatt)
11. Hi Jorgen car Qmartin
12. To another (for example, Diena)
13. Furniture student residence (the family of dual + blankets + Vrchan + Tararih)
14. Tamoinat appropriate solution to water (one of the major problems)
15. Appropriate solutions to the appointments of teachers and their salaries
16. Appropriate solutions to the appointments of staff, workers and their salaries
17. Updated computers (or the acquisition of new modern)
18. Internet lines of the College (essentially a financial problem)
19. Complete furnishing departments College (stores + labs + Library + Archives + registration ...)
14. Tamoinat appropriate solution to water (one of the major problems)
15. Appropriate solutions to the appointments of teachers and their salaries
16. Appropriate solutions to the appointments of staff, workers and their salaries
17. Updated computers (or the acquisition of new modern)
18. Internet lines of the College (essentially a financial problem)
19. Complete furnishing departments College (stores + labs + Library + Archives + registration ...)
20. Scientific books in different disciplines
21. Laboratory instruments languages (English + French + German ...)
22. Nutrition students (very important that there is also a separate proposal)
IV: Proposals student nutrition
21. Laboratory instruments languages (English + French + German ...)
22. Nutrition students (very important that there is also a separate proposal)
IV: Proposals student nutrition
Housing for students currently a capacity of no more than 250 students in normal circumstances (note that in practice a number of students in the department of 80-90% of college students view of the complexity of the region) and that number possible to change during the year (senior year at the beginning (October + November) and in view of the decreasing number of leaks and withdrawal and diminishing number after exams I (February + March) according to the results of examinations) and there is usually an average of 150 students to 200 students are present year-round housing in the procedure.
In the event of a feeding support from any quarter, the Dean suggests that the nutrition is concerned in any way following (or any way it deems appropriate on the side) and agree on the details of any proposal with Dean:
The first:
Be appointed contractor (Observer, Musharraf) by the concerned party, where the students handed over feeding (weekly or monthly) are usually dry feedstock material (such as flour, rice, tuna, beans, peas, oil, Alrotti, bread, water Health for drinking, eggs, ... etc.) and identify the concerned that they may deem appropriate quantity.
In the event of a feeding support from any quarter, the Dean suggests that the nutrition is concerned in any way following (or any way it deems appropriate on the side) and agree on the details of any proposal with Dean:
The first:
Be appointed contractor (Observer, Musharraf) by the concerned party, where the students handed over feeding (weekly or monthly) are usually dry feedstock material (such as flour, rice, tuna, beans, peas, oil, Alrotti, bread, water Health for drinking, eggs, ... etc.) and identify the concerned that they may deem appropriate quantity.
The second proposal:
Musharraf is appointed (Observer, on secondment) by the concerned party is to pay a certain amount (daily, weekly, monthly) to students in order to suit the nutrition consistent with the estimates involved.
Third proposal:
Musharraf is appointed (Observer, on secondment) by the concerned party is to pay a certain amount (daily, weekly, monthly) to students in order to suit the nutrition consistent with the estimates involved.
Third proposal:
Are concerned by the building's kitchen for students and a dining room in the hostel is under the supervision of the contractor (Observer, the contractor) is appointed by the concerned students are fed directly through cooking and distributing them directly to their quotas in each meal and what is appropriate (Dean of the college will ask the concerned kindly Hygiene conditions requiring the contractor by the university and systems under the control of Dean, and Dean is ready to provide a temporary kitchen for a term not exceeding 6 months until the completion of the construction of the hall kitchen and note that required new buildings automatically become the property of the College).
In conclusion:
Dean hopes the College, teachers, staff, workers and students that the points the previous four have given an idea of the overall situation and everyone is ready to cooperate in the interests of the college and development.
In conclusion:
Dean hopes the College, teachers, staff, workers and students that the points the previous four have given an idea of the overall situation and everyone is ready to cooperate in the interests of the college and development.
Last Updated Wednesday, 30 June 2010